PRODUCTS
Warning: Attempt to read property "term_id" on bool in /www/wwwroot/china-smallappliances.com/wp-content/themes/smallappliances/functions.php on line 239
Stable Operation Strong Steam Flow Garment Care Steam Solution Garment Steam Iron Supplier Clothing Factory Steam Iron
Brand Customization: Support for customer brand logo design and printing.
Product Appearance: Color, material, and size can be adjusted according to requirements.
Packaging Options: Customized packaging design available (color box, gift box, etc.).
Minimum Order Quantity (MOQ): MOQ ranges from 1,000 to 5,000 units depending on the product type.
Production Lead Time: 3-7 days for samples, 30-45 days for mass production.
Introduction
| voltage | 220 V, 380 V | power(w) | 2500 |
| core components | Pressure Vessel | machinery test report | Not Available |
| video outgoing-inspection | Not Available | weight (kg) | 16 |
| production capacity | 50 | dimension(l*w*h) | 750*300*400mm(29.53*11.81*15.75in) |